Pembroke Dock Marine – Slipway Technical Consultation

05 July 2021

The Port of Milford Haven has released a technical consultation to share the key design elements that will make up a critical component of the Pembroke Dock Marine scheme. The joining together of Slipways 1 and 2 will create a large multiuse slipway capable of meeting the needs of the Waterway and maritime industry over the next 40 years. Whilst an effective design is proposed based on expert knowledge, it is still of critical importance that the views and expertise of those who could benefit from the Pembroke Dock Marine project are taken into account before the design is finalised. The consultation will run over the course of the next two weeks.

Tim Bownes, Project Advisor, has produced a short video on the key features currently integrated into the design. Please watch the video and then provide us with your feedback below.

 

Have your say >

If you would like to arrange an appointment to provide your feedback, please get in touch.

The deadline for feedback on this consultation is 16th July.

Pembroke Dock Marine is funded by the Swansea Bay City Deal, the European Regional Development Fund through the Welsh Government, and through private investment.

 

ERDF logo Swansea Bay City Deal logoPembroke Dock Marine logo